Council-certified Moisture Control Consultant Exam Prep
Free practice questions

Free CMCC Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The CMCC exam has 120 questions and runs 3 hours.

These 10 free CMCC questions are organized by exam domain, so you can see how each part of the Council-certified Moisture Control Consultant blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: The Science of Water

Question 1

An electric heater raises the air temperature in a drying enclosure from 68°F to 86°F. Relative humidity falls from 60% to 33%, while the dew point remains approximately 54°F and barometric pressure is unchanged. A technician says the heater has removed nearly half the moisture from the air. What do the readings actually establish?

Show answer & explanation

Correct answer: C - The humidity ratio is essentially unchanged despite the lower relative humidity.

Question 2

On a cool, misty morning, a warehouse measures 80°F and 50% RH indoors, with a dew point of approximately 60°F. Outdoor air is 50°F and 90% RH, with a dew point of approximately 47°F. Adequate heating and safe outdoor-air exchange are available. The owner objects to ventilation because the outdoor RH is higher. Which assessment is correct?

Show answer & explanation

Correct answer: B - Outdoor air can remove moisture because its dew point is lower.

Domain 2: Site Drainage

Question 3

A grading survey records soil elevation 100.00 ft at a foundation and 99.80 ft at a point 10 ft horizontally away. The project requires a uniform slope of at least 5% away from the building over that distance. The cladding already has its minimum permitted clearance above the soil, and positive drainage is available beyond the outer point. Which proposed grading change satisfies both the slope and clearance constraints?

Show answer & explanation

Correct answer: B - Retain the wall-side grade at 100.00 ft; lower the outer grade to 99.40 ft.

Domain 3: Foundations

Question 4

Water enters a basement at the floor-to-wall joint after prolonged rain. Surface grading and roof runoff have been corrected. The exterior wall membrane is intact, and the footing drain discharges freely, but the entire drainpipe is above the basement floor elevation. Which design correction addresses the remaining groundwater vulnerability?

Show answer & explanation

Correct answer: D - Lower the drain so its top is below the slab underside.

Domain 4: Walls, ceilings, and floors

Question 5

A controlled water test reproduces leakage above a window. An inspection opening reveals that water descending the wall's water-resistive barrier passes behind the head flashing: the flashing's upper leg is installed over the barrier, with its top edge unsealed. The flashing itself is intact. Which repair restores the intended drainage path?

Show answer & explanation

Correct answer: A - Lap the wall's water-resistive barrier over the head flashing's upper leg.

Domain 5: Roofs and building envelope assemblies

Question 6

During several continuously freezing days, snow melts over the heated rooms of a house but remains at the cold eaves, where an ice ridge forms. The vented attic has open soffit and ridge vents, substantial air leaks at ceiling penetrations, and thin insulation near the eaves. Which retrofit addresses the identified cause of the melting rather than simply managing the resulting water?

Show answer & explanation

Correct answer: C - Seal ceiling bypasses and restore insulation without blocking eave ventilation.

Domain 6: Plumbing

Question 7

The ceiling below a tiled shower leaks during use. Supply piping passes a pressure test. Running water at the normal shower flow rate through a hose into the drain throat, bypassing the receptor and its drain-flange connection, produces no leak. With the shower supply off, controlled wetting of the shower walls and receptor reproduces the drip. Where should the next localized inspection be directed?

Show answer & explanation

Correct answer: A - The receptor waterproofing and its wall and drain connections.

Domain 7: HVAC

Question 8

An office has design cooling loads of 24,000 Btu/h sensible and 8,000 Btu/h latent. The listed net cooling capacities apply at the specified project operating conditions. Sensible heat ratio (SHR) is sensible capacity divided by total cooling capacity. Which equipment selection has sufficient capacity for BOTH loads at this design point?

Show answer & explanation

Correct answer: B - Total capacity: 36,000 Btu/h; SHR: 0.70.

Domain 8: Structural Drying

Question 9

A contractor recommends removing wallboard after a pinless moisture meter gives high readings along a narrow vertical strip. The strip coincides with metal corner bead; adjacent gypsum board reads low and shows no swelling or softness. Before authorizing removal, the consultant should:

Show answer & explanation

Correct answer: D - Use pin measurements clear of metal, with matching dry gypsum for comparison.

Question 10

A restoration crew finds standing water in a basement touching wall receptacles and a power strip. Circuit status is unconfirmed, and the electrical panel can be reached only by crossing the water. Extraction equipment is ready at the dry doorway. What must happen before anyone enters the water?

Show answer & explanation

Correct answer: D - Have qualified personnel isolate power and verify deenergization from a dry location.

The rest of the CMCC blueprint

The CMCC exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more CMCC questions with explanations.

Continue in the free practice test →

View plans